AE-LOG > AE-1971-031
| Field | Value |
|---|---|
| Date | 1971-06-30 |
| Site | FAC-B Threshold Works |
| Reporter | BALLAST / MOTH (missing) |
| Media | still photos water-damaged; audio hum reel |
Evaluation Hall 3 grew a secondary corridor overnight. Carpet was wet though no pipes feed the wing. Fluorescent fixtures buzzed in a rhythm matching no installed ballast. Team MOTH entered to plant survey bolts. Only BALLAST returned, without MOTH and without a coherent count of doors passed.
Public cover: chemical spill. Congressional attention begins here and ends in the 1974 dissolution.
Hall 3 sealed with concrete that later measured thinner from the inside. Continuity operators still file humidity anomalies from the site.